Running / Ongoing Projects

Explore active civil engineering sites currently undergoing RCC slab casting, structural steel erection, MEP installations, and luxury finishing works across UP.

Home / Projects / Running Projects
LIVE SITES โ€ข เคฒเคพเค‡เคต เคจเคฟเคฐเฅเคฎเคพเคฃ เค•เคพเคฐเฅเคฏ

Active Ongoing Construction Sites

Live transparency into ongoing structural milestones, completion percentages, and estimated delivery dates.

Gomti Nagar Green Villa Phase-II
RUNNING SITE Residential Construction
90% Done
๐Ÿ“ Gomti Nagar Extension, Lucknow

Gomti Nagar Green Villa Phase-II

Upcoming luxury duplex villa featuring double-height ceiling, Italian marble, smart home electrical conduits, and landscaped terrace garden.

Execution Progress 90%
Built-up Area 5,200 Sq Ft
Est. Handover Apr 2027
Live Stage: Phase Active Request Site Visit โ†’
Vrindavan Yojana Multi-Story Heights
RUNNING SITE Residential Construction
65% Done
๐Ÿ“ Sector 7, Vrindavan Yojana, Lucknow

Vrindavan Yojana Multi-Story Heights

12-floor residential apartment superstructure. Slabs completed up to 9th floor, brick masonry and internal plumbing currently underway.

Execution Progress 65%
Built-up Area 45,000 Sq Ft
Est. Handover Dec 2026
Live Stage: Phase Active Request Site Visit โ†’
Indira Nagar Modern Turnkey Duplex
RUNNING SITE Turnkey Projects
45% Done
๐Ÿ“ Block C, Indira Nagar, Lucknow

Indira Nagar Modern Turnkey Duplex

Turnkey residential house construction. Structural columns and first-floor slab completed. Electrical conduit laying in progress.

Execution Progress 45%
Built-up Area 3,800 Sq Ft
Est. Handover Sep 2026
Live Stage: Phase Active Request Site Visit โ†’
Outer Ring Road Asphalt Highway Paving
RUNNING SITE Road & Highway
75% Done
๐Ÿ“ Kisan Path to Mohanlalganj, Lucknow

Outer Ring Road Asphalt Highway Paving

Four-lane bituminous concrete road paving, WMM base course, and RCC side drainage network across the 15-kilometer highway section.

Execution Progress 75%
Built-up Area 15 KM Corridor
Est. Handover Aug 2026
Live Stage: Phase Active Request Site Visit โ†’
Barabanki Industrial PEB Warehouse & Epoxy Flooring
RUNNING SITE Industrial Construction
55% Done
๐Ÿ“ Kursi Road Industrial Area, Barabanki

Barabanki Industrial PEB Warehouse & Epoxy Flooring

Pre-Engineered Building structural steel frame erection with heavy-duty laser screed concrete flooring and 3mm self-leveling epoxy coat.

Execution Progress 55%
Built-up Area 25,000 Sq Ft
Est. Handover Oct 2026
Live Stage: Phase Active Request Site Visit โ†’